Overhead lines

Requirements for the resistance to forces and climate

../../fileadmin/upload/2.0_Freileitungen/2.1_Anforderungen/Freileitungen-Anforderungen-Content-1.jpg

 

Our insulators are exposed daily to enormous tensile stress in the construction of transmission lines, because the towers used in energy transmission utilize 1300 ft to 1700 ft spans with a weight of approx. 22 tons. They must remain exposed to these forces for a duration of several decades without endangering safety or reduction in their functionality.

../../fileadmin/upload/2.0_Freileitungen/2.1_Anforderungen/Freileitungen-Anforderungen-Content-2.jpg

Environmental influences, such as

  • rain
  • storm
  • tempest

../../fileadmin/upload/2.0_Freileitungen/2.1_Anforderungen/Freileitungen-Anforderungen-Content-3.jpg
  • snow
  • ice
  • extreme cold

../../fileadmin/upload/2.0_Freileitungen/2.1_Anforderungen/Freileitungen-Anforderungen-Content-4.jpg
  • sunlight
  • heat
  • drought

 

as well as extreme climatic conditions around the world also place a challenge on materials and products.